TP Room

G416

Type
Klasserom
Building
Pilestredet 50, Katti Anker Møllers hus
Floor
4
Capacity
100

Information

Equipment

  • Dokumentkamera
  • Flatt gulv
  • Opptak av undervisning
  • Tilkobling av laptop via HDMI og USB-C
  • Projektor
  • Whiteboard
  • PTZ-kamera (tracking kamera)
  • Utstyr for fjernundervisning/hybridundervisning
The teaching staff is responsible for evacuation in an emergency. It is therefore important to familiarise oneself with the evacuation plans.
Picture of the room Picture of the room Picture of the room